If care is taken metal roofing application can be aided by pre drilling panels allowing screws to go quickly and accurately into the desired spacing.
Metal rib roofing installation.
Roofing installation options allow an overhang a minimum of 1 at the eave to provide for a drip edge.
5 rib installation guidelines caution.
For use by its customers and is intended to be a guide only.
To guard against wind damage at the eaves and for a neatly finished appearance gable trim is recommended.
Pre drilling will work provided that pilot holes are placed accurately in the proper locations on panels.
Of 24 on center is required.
This is part 1 of a 6 part video series explaining how i installed a metal roof on my house.
Purlin spacing must be uniform and carefully measured.
To protect against uplifting winds and to provide a finished appearance apply rake trim or other standard gable trim.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater.
Residential color visualizer.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowl edgeable erectors.
Use extreme care while installing roof panels.
This guide is supplied by fabral inc.
Wide rib rugged rib regal.
Install screws every 6 10 inches.
Another option is to install a or 7 8 lap stitch screw in the crown of the rib to secure the side lap.
This guide must by read in its entirety before beginning installation.
This does not replace local or.
Introduction to the sl 16 metal roofing system.
Blog contact us about us shop shop.
Butyl tape as shown below is recommended along panel side laps.