Varmasteel recognizes that installation techniques can vary based upon builder and geo.
Metal roofing installation on a steel structure.
Install the roofing screws vertically along each rib in the panel.
Steel roofs are long lasting and withstand inclement weather.
Take care the first piece is aligned precisely perpendicular square to the edge.
A metal roof installation is always a wise choice when you are looking to replace your old roof.
Improper installation can cause leaking significant life span reduction and potentially damage an entire structure.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Luckily the results are worth it.
These are either cast in rcc footings or site fixed into rcc walls slabs columns using approved chemicals.
Standard details for metal roofing and siding the details and written instructions described in this manual are suggested installation methods toensure a quality application of our products and should be considered as a guideline only.
A typical installation sequence shall be as follows.
Photo courtesy of roof hugger installing a metal roof is a complicated process with many details.
The anchor bolts that hold the steel structure fixed on a base plate will be done.
In this video i cover measuring the roof figuring the metal t.
Here at clm roofing we will help install a metal roof for you we will gather the appropriate materials accessories and metal roof supplies.
Always begin working at the point with the longest peak to eave distance.
Add the metal panels.
A steel roof will do a much better job of holding up against the weather elements.
This is part 1 of a 6 part video series explaining how i installed a metal roof on my house.
Install metal panels or shingles align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
When a metal roof fails while it could be due to its design more likely it is due to installation problems.
We will remove your old roof and then apply a layer of insulation for the.
Alignment and survey works will be done first with a calibrated survey instrument.